PROJEKTE

Architektur und Städtebau

Filter: All
  • All
  • STÄDTEBAU
  • WOHNEN
  • KULTUR
  • OFFICE
  • AUSBILDUNG
  • HANDEL
  • VERKEHR

BUSINESS CENTER ZIM-A

HOTEL f117

WB ROSENSTEIN

WB BELGOROD CITY

GASKUGEL HEILBRONN

ZIK

FLAMENKO PARK

WB ZIM CITY

WB ROSATOM

HAUS "IN UND JAN"

GLINKI-II

RESTAURANT CORVETTE

MFK "PARUS"

GLINKI-I

HAUS B5

GEMEINDEHAUS

TERRASSEN RESIDENZ

WOHNANLAGE ISBUSCHKA

AUTOHAUS

WALA

ARABESKA

M-CAMPUS

HABA

EUROPAVIERTEL FFM

RESTAURANT FAST FOOD

FESTIVAL-ARENA

FLUGHAFEN "TOLMATSCHOWO"

JUMA

BUSINESS CENTER ZIM-A, SAMARA

in ARGE mit Nixdorf Consult GmbH.

Shopping and entertainment center - 4-7 storey complex with a total area of 60 thousand square meters. In addition, shopping areas are in the portion that part of residential areas - 85 thousand square meters. Thereby we reduce the load on the mall and at the same time enliven residential neighborhoods, creating a chain of food stores, boutiques, furniture showrooms, restaurants and cafes. Thus, all the streets of residential areas are restful place for walking and recreation.

Projekt, 2019

Bauherr: DELTASTROY

Samara / Russland

Groesse: BGF 60 000 m2

HOTEL f117, Stuttgart

Projektstudie

Projekt 2019

Bauherr: Stadt Stuttgart

Groesse: BGF 5.900 m2

Stuttgart, Deutschland

WB ROSENSTEIN, Stuttgart

In ARGE mit Nixdorf Consult GmbH

Gegenstand des Planungswettbewerbs ist die Erarbeitung eines städtebaulichen und freiraumplanerischen Entwurfsvorschlags als Leitbild für die zukünftige Entwicklung des Stadtgebietes Rosenstein im zentralen Bereich der Landeshauptstadt Stuttgart.

Projekt 2018

Bauherr: Stadt Stuttgart

Das Team:

Paul Moor / Nixdorf Consult GmbH

Dmitry Boykov / db-arch studio

Stuttgart, Deutschland

Groesse: 80 Ha

Auszeichnungen: 2.Rundgang

BELGOROD CITY, Belgorod

Administrative and office complex / Belgorod, Russland
The BELGOROD CITY administrative and office complex at south-west district of Belgorod offers a floor space of around 117,000 square metres and is home for 46000 workplaces. The main idea of the urban planning and building design was to create comfortable environment for both the workers and neighboring residents. In addition to the main use of the building ensemble as public authorities and business offices, it also houses event and congress rooms, a shopping center, sports and wellness centers, children's clubs, cinemas, restaurants and galleries. In the middle there is a square with water feature and sculpture, which is intended to act as both a magnet and a calming influence for the visitors as a sheltered courtyard area. But also offers the square space for city festivals, events, music shows, open air cinema in summer and ice skating with Christmas tree in winter. The open-plan office concept with fluid transitions within the space requires high durability and flexibility in terms of flooring in the work and event areas. The warm color of the wooden surfaces helps create a pleasant atmosphere in the meeting and lounge areas. The floors are very comfortable to walk. The free-form and curving structure of BELGOROD CITY forms a characteristic solitaire as a new architectural accent in the south-west district of Belgorod. Greenery and bright atmosphere determine the courtyards and buildings. The free-form, curved building lends the office building a unique flair in future Sport Park. The generous use of natural lighting, the varied facade, contribute to this building’s stunning impact, not only due to its sustainability. Following the principle of 'Working in the countryside' the free-form structure of the building refers to its surroundings with its forward and backwards swinging facades. The organic architectural language of the building compliments the landscaping around it. The recessed facade entrance leads visitors into a 4 glass-roofed courtyards. The wooden decks, water areas, cafés and the adjoining foyer makes it a much liked meeting point and event space. With its organically curving facade the administrative and office building Belgorod city brings dynamic forms into existed circular traffic intersection. The free-form and curved building structure sets a new structural accent as a characteristic solitaire. Water features on the grounds surround the structure in gentle curves and mirrors the organic curved building as a reflection in the landscape. The parking area with almost 1600 parking places around the building follow the same design language and complement the building's overall appearance, both functionally and creatively.

Projekt 2018

Bauherr: Stadt Belgorod

Das Team:

Dmitry Boykov / db-arch studio,

Paul Moor / Nixdorf Consult GmbH

Belgorod, Russland

Groesse: BGF 117 000 m2

Auszeichnungen: 1.Preis "Eurasian Prize" 2018, 2.Preis internationaler Wettbewerb 2018, 2.Preis "Zolotaya Kapitel" 2019

GASKUGEL, Heilbronn

FORSCHUNGSZENTRUM HHN / "Gas holder" / Science Research and Educational Centre of HHN Heilbronn University. Gas holder‘s reconstruction and adaptation for the scientific, educational and cateringfunctions in Heilbronn / Germany Project idea: Under large green stepped roof curved like a hill, the space beneath houses will the Science Research and Educational Centre. A sphere, the symbol of technology, pierces the building and the landscape. The gas holder will be adapted to catering and leisure functions: a 3D cinema, a museum of technology, an exhibit room. There will be open air cinema, performances on the roof. On the south side of the sphere will be installed solar collectors.

Projekt 2012

Bauherr: Kaco energy, Ralf Hofmann, Ralf Klenk und HHN

Heilbronn, Deutschland

Groesse: BGF 6.900 m2

Auszeichnungen: 2.Preis "Zolotaya Kapitel" 2014, Silver Award "Zodchestvo" 2013, BRA Diplom "Zodchestvo" 2013, 2.Preis "Eurasian Prize" 2012

ZIK

BUSINESS- UND EINKAUFSZENTRUM IN STUTTGART.

Projekt 2017

Bauherr: Privat

Stuttgart, Deutschland

BUSINESS CITY FLAMENCO-PARK, St.Petersburg

Project idea: The building complex consist of two elements: Flamenco park and Business centre towers. The Park is created on the roof of the community cultural center. A large green stepped roof curved like a hill rises in the north and the south of the 4,7 hectares site. It creates two public spaces: cultural centre, restaurants, fitness centre, exhibitions, shopping and parking under the vault roof, and one fully accessible public plaza with attractions and water spaces on the curved roof. The two 41-storey skyscrapers contain the exhibition space and restaurants (ground floor and the 1st floor), offices (2-29 floor), residential areas (30-36 floor) and luxury hotels (37-40 floor). The towers react to the surroundings and to each other, to give optimum views at every level. The design for the Dancing Towers is inspired by flamenco. The subtle rotation of the towers creates the illusion that they are dancing, gracefully propelled by the dancer’s movements. Each tower will be pierced on two sides by an atrium space, which will allow us to create a terrace on every floor with evergreen gardens, cozy cafes, and spas. Solar panels will be integrated into the glass-bearing constructions. Deicing systems will be installed on facades and balconies. The towers are engineered as entire eco-systems, a model for future sustainable urban development.

Projekt 2012

Bauherr: IGP GmbH

St.Petersburg, Russland

Groesse: BGF 198 800 m2

Auszeichnungen: BRA Diplom "Zodchestvo" 2013, 2.Preis "Zolotaya Kapitel" 2013, Audience Award "Eurasian Prize" 2012

ZIM CITY, Samara

Project idea: The main idea of ​​the project is to transform a coastal industry land of the ZIM factory in a modern residential resort, with public urban entertainment, shopping, business center, and a remarkable strong sign on the Samaras Volga-coast. The buildings on the coast must imitate the appearance of waves, boats and the mountains in the background. It is a complex built at the heart of a residential and commercial complex designed to be a resort where Samara citizens may find everything they need on site. The 4 wave shaped buildings act as a giant entrance. The zone of a housing estate in order to avoid noise discomfort is placed on considerable distance from New-garden street. Between this highway and inhabited quarters is situated a municipal zone on which will be located shopping centre, business centre, the educational centre, parkhouse for a parking of personal motor transport, and also the public centre with functions of management, cultural and community service, youth leisure and sports, health services. The educational centre including preschool institutions and schools, is placed out of inhabited groups, in immediate proximity from Volga region State college and the Samara Instrument-making technical school, forming an original educational campus.

Projekt, 2013

Bauherr: Delta-Stroy Samara

Das Team:

Dmitry Boykov / db-arch studio,

Paul Moor / Nixdorf Consult GmbH

Samara / Russland

Groesse: gesamte NF 1.193.000 m2

Auszeichnungen: 1.Preis "Eurasian Prize" 2014, 2.Preis internationales Wettbewerb 2014

ROSATOM, Moskau

Architectural Concept for the Atomic Energy Pavilion on the territory of the Exhibition of achievements of national economy (OJSV VDNH) Architectural Image. Having rolled in the middle of the park the giant spheres create the image of a fantastic atom model. The power of nature combines with the power of energy in the created composition. The interaction of symbols expresses the idea of the pure energy that serves the needs of the mankind without destroying the environment. The emphasis on the ecology is highly important for the first overview. The spaciousness and purity become the main impressions, and the exterior of the pavilion arouses the desire to come inside. The conception does not determine the final arrangement but provides a clear structure of the dialogue of the parties concerned. The comparison of different proportions allows a person to passage from a real environment to a microcosm. A sharp alteration of spaces along the whole way in the pavilion deepens an impression of balance between two realities. Space Planning. The pavilion is divided sharply into an underground part and a visible superstructure. The visitor is met by the transparent domes in the form of spheres. The most impressive exposition can be seen through them; separate entrances lead to a restaurant, a café and the outcropping service lines. The glass enclosures also serve for lightning of the lower spaces. The most part of the housing capacity is placed underground that enhances the mysterious feeling and creates the contrast of impressions. The radial efferent structure put on the projection of the spheres determines the planning structure. The central vertical is the transport axis of the pavilion and has the main semantic meaning. It unites all levels. This vertical provides a visual connection with the help of which the daylight comes to all floors. The service lines such as elevators, stairs, escalators, ramps are places here. This space is filled with informative electronic devices. A small sphere (diameter is 36 m) seems to hang within the main dome (diameter is 36 m). This symbolic nucleus is supported by three elevator cores. One can get to the upper viewpoint (the height is 22 m) by means of a hupaithric panoramic ramp which is provided with informative screens. There is a wide spiraling ramp inside the nucleus. The main hall of neuromatrix is placed here – a space without square corners, surfaces and determined positions. The entrance inside the pavilion is placed at ground level inside the main dome near the neuromatrix vertical. Services to visitors are provided on the level -1 (the mark -4, 80). Cloakrooms, public toilets, a shop and a lower level of the café are placed on this level which is connected with floors of a restaurant above ground by means of stairs. The display area of the lower levels is well seen from the entrance hall. The daylight comes to the level -2 (the mark -9, 00). The upper entrance to the conference hall, a creative lab and a reading hall are located here. There is a main exposition “The nuclear projects of the USSR and Russia” with large-sized exhibits and the lower entrance to the conference hall with attended areas on the level -3 (the mark -13,20). The thematic exhibitions, a museum depository and two-level parking are located on the level -4 (the mark -17, 40). Landscape. A green roof of the underground pavilion appears to be an extension of the surrounding park. The alternation of a grass lawn and different sorts of paving creates a carpet look. The concentric rings of the main domes unite the whole composition. The paths for walking seem to be electron orbits. The surrounding trees are left untouched, new plants are planted on the green roof. Benches for rest are included into the general landscape view. The composition of the atomic model is completed by small sculptural spheres. The night illumination of the area is comported with the design of the domes and dome lights. Multimedia.The night illumination consists of several components. The main image is transferred by powerful projection units to the spherical surface of the “nucleus”. A LED reticle is mounted on the outer surface of the main dome along the ribs. It creates the additional image. The same reticle is mounted on the small domes. The non-transparent surfaces of every sphere are illuminated with the lamps.

Projekt, 2014

Bauherr: ROSATOM

Das Team:

Sergey Trofimov und Natalia Trofimova / TROFIMOV STUDIO,

Dmitry Boykov / db-arch studio

Moskau / Russland

Groesse: BGF 25.000 m2

Auszeichnungen: 3.Preis "Eurasian Prize" 2015, 2.Preis "Zolotaya Kapitel" 2016

HAUS "IN UND JAN", St.Petersburg

Einfamilienhaus "in und jan" in St.Petersburg. Ein Haus für eine Familie.

Projekt, 2016

Bauherr: Privat

St.Petersburg / Russland

Groesse: BGF 350 m2

BUSINESS CITY GLINKI-2 / V2, St.Petersburg

Die „Stadt in der Stadt“ mit ihren verwinkelten Gassen und Plätzen sollen hier entstehen. Manche bemerkenswerten und schmucken Bauten bleiben erhalten, sie werden saniert und so können die Vergangenheit mit der Zukunft vereinen. Das neue Areal entlang der Glinki-Strasse mit seiner vielfältigen Nutzung und ansprechenden Architektur weist den Weg in die Zukunft und entwickelt sich zu einem Zentrum für neue Medien, Kunst, Kultur, Einkauf und Entertainment St.Petersburgs. Tagsüber bestimmen Medienschaffende und Geschäftsleute das Bild, am Abend und in der Freizeit machen ein modernes Fitness-Studio, ein Kino, eine Diskothek, die Ausstellungsgalerien sowie mehrere gastronomische Angebote das Areal Glinki-2 zu einem bunten Treffpunkt. Abgerundet wird das Angebot noch durch eine Kindertagesstätte sowie mehrere Einzelhändler.

Projekt, 2006

Bauherr: Ruric AB

St.Petersburg / Russland

Groesse: BGF 220 000 m2

RESTAURANT CORVETTE, St.Petersburg

Restaurant Corvette befindet sich am Ufer-Promenade im Nord-Westen St.Petersburgs.

Projekt, 2016

Bauherr: Privat

St.Petersburg / Russland

Groesse: BGF 600 m2

MFK "PARUS", Rostov

Multifunktionaler Komplex "Parus" in Rostov Multifunktionaler Komplex mit Shopping Mall, Büro- u. Hotelturm. Die drei primären Nutzungseinheiten Hotel, Office und Shopping Mall sind trotz eines zusammenhängenden, architektonischen Grundkonzeptes von außen einzeln ablesbar.

Projekt, 2014

Bauherr: Privat

Rostov / Russland

Groesse: BGF 120 000 m2

BUSINESS CITY GLINKI-2 / V1, St.Petersburg

Business city Glinki-2 Die „Stadt in der Stadt“ mit ihren verwinkelten Gassen und Plätzen sollen hier entstehen. Manche bemerkenswerten und schmucken Bauten bleiben erhalten, sie werden saniert und so können die Vergangenheit mit der Zukunft vereinen. Das neue Areal entlang der Glinki-Strasse mit seiner vielfältigen Nutzung und ansprechenden Architektur weist den Weg in die Zukunft und entwickelt sich zu einem Zentrum für neue Medien, Kunst, Kultur, Einkauf und Entertainment St.Petersburgs. Moderne Elemente vereinen den optischen Anspruch mit Funktionalität. Unter dem Glasdach im Herzen des Areals, welches nicht nur vor Wind, Regen und Schnee schützt, sondern als eine Art gläserner Himmel den Innenhof überspannt verbinden sich Arbeit und Freizeit. Tagsüber bestimmen Medienschaffende und Geschäftsleute das Bild, am Abend und in der Freizeit machen ein modernes Fitness-Studio, ein Kino, eine Diskothek, die Ausstellungsgalerien sowie mehrere gastronomische Angebote das Areal Glinki-2 zu einem bunten Treffpunkt. Abgerundet wird das Angebot noch durch eine Kindertagesstätte sowie mehrere Einzelhändler.

Projekt, 2006

Bauherr: Ruric AB

St.Petersburg / Russland

Groesse: BGF 140 800 m2

HAUS B5, St.Petersburg

Es ist ein Haus mit urbanem Charakter, das gestalterisch in die moderne Zeit passt. Die klaren Linien nehmen deutlich Bezug auf die architektonischen Vorstellung der Bauhaus-Meister. Im Innern bieten 350 Quadratmeter auf zwei Ebenen viel Platz für eine fünfköpfige Familie.

Projekt, 2014

Bauherr: Privat

St.Petersburg / Russland

Groesse: BGF 350 m2

GEMEINDEHAUS, Frankfurt am Main

Das konzeptionelle Projekt eines ueberkonfessionellen Zentrums in Frankfurt am Main: ein religioeses Zentrum in der Stadt, Gemeindehaus RAUM FUER BEGEGNUNG Die spiralfoermige Rampe als Simbole des evigen Lebens bildet das zentrale Gebaeudeelement. Dabei praegt das kubusfoermige Volume die Identitaet des einfachen introvertierten Raums fuer Begegnung.

Projekt, 2001

Bauherr: Gemeinde / Frankfurt am Main

Frankfurt am Main / Deutschland

Groesse: BGF 2 000 m2

TERRASSEN RESIDENZ & HOTEL, NOWOROSSIJSK

Konzeptstudie / alternative Wohnformen

Projekt, 2011

Bauherr: privat

Noworossijsk / Russland

Groesse: BGF 25 000 m2

WOHNANLAGE ISBUSCHKA, SOCHI

Konzeptstudie / alternative Wohnformen

Projekt, 2016

Bauherr: privat

Sochi / Russland

Groesse: BGF 127 000 m2

AUTOHAUS, STUTTGART

Autohaus / Studie für die Firma Hahn&Kolb

Projekt, 2014

Bauherr: Hahn&Kolb

Stuttgart / Deutschland

Groesse: BGF 2 500 m2

WALA ERWEITERUNG HAUPTSITZ, BAD BOLL

Teilnhame am Wettbewerb fuer h4a gessert+randecker architekten / Stuttgart

Projekt, 2008

Bauherr: WALA Stiftung

Bad Boll / Deutschland

Groesse: BGF 47 182 m2

Art der Teilnahme: Mitarbeit beim Entwurf, CAD Pläne

Auszeichnungen: 1.Preis 2008

ARABESKA, MÜNCHEN

Teilnhame am Wettbewerb fuer h4a gessert+randecker architekten / Stuttgart

Projekt, 2007

Bauherr: Bayerische Versorgungskammer

München / Deutschland

Groesse: BGF 49 000 m2

Art der Teilnahme: Konzeptentwicklung, Mitarbeit beim Entwurf, CAD Pläne

Auszeichnungen: 1.Preis 2007

TECHNOLOGIEPARK M-CAMPUS, MÜNCHEN

Teilnhame am Wettbewerb fuer h4a gessert+randecker architekten / Stuttgart

Projekt, 2003

Bauherr: Stadtwerke München

München / Deutschland

Groesse: BGF 1BA 25.242 m2

Art der Teilnahme: Mitarbeit beim Entwurf, CAD Pläne

Auszeichnungen: 1.Preis 2003

HAUPTVERWALTUNG HABA, BAD RODACH

Teilnhame am Wettbewerb fuer h4a gessert+randecker architekten / Stuttgart

Projekt, 2002

Bauherr: Fa. Habermaaß

Bad Rodach / Deutschland

Groesse: BGF 5 230 m2

Art der Teilnahme: Mitarbeit beim Entwurf, CAD Pläne

Auszeichnungen: 1.Preis 2002

WOHNQUARTIER IM EUROPAVIERTEL WEST, FRANKFURT AM MAIN

Teilnhame am Wettbewerb fuer h4a gessert+randecker architekten / Stuttgart

Projekt, 2002

Bauherr: Vivico Management GmbH + aurelis real estate GmbH Deutsche Bahn Immob. Gesellschaft mbH

Frankfurt am Main / Deutschland

Groesse: 25 ha

Art der Teilnahme: Mitarbeit beim Entwurf, CAD Pläne

Auszeichnungen: 1.Preis 2002

RESTAURANT FAST FOOD, NOWOSIBIRSK

Cafe Fast Food am Kalininplatz in Nowosibirsk. Eine simmetrische Komposition ist von städtebaulichen Situation geprägt. Zur Stadt hin öffnet sich das Gebäude und führt den Besucher in einen grosszügigen Eingangshof, als Zentrum der beiden Restaurant- und Cafegebäuden, von wo die einzelnen Abteilungen auf kürzestem Wege erreicht werden können.

Projekt, 1997

Bauherr: Privat

Das Team: Alexander Jughakov (Yukon), Dmitry Boykov

Nowosibirsk / Russland

Groesse: BGF 1.800 m2

FESTIVAL-ARENA, NOWOSIBIRSK

Ein Komplex für jährliche musikalische Feiern, Rockfestivale, Pressekonferenzen, Ausstellungen und Mediashows. Die Hauptidee des Projektes ist eine grosse, fantastische Show zu zeigen, die Leute aller Altersstufen anziehen soll. Das Media-Center befindet sich auf dem Ufer des Flusses Ob. Es gibt vier Türme, die für die TV- und Radiotranslation verwendet können. Diese Türme sind durch je zwei Trägerkonsolen mit einer Leinwand verbunden. Diese Leinwände sind für die Projektion verschiedener Filme und Spezialeffekte wichtig. Sie können ihre Position ändern und die “Theaterdekoration“ tauschen. Es ist eine dynamische Architektur. Diese Bewegung birgt viele Kompositionsmöglichkeiten: so zum Beispiel ein Kreuz in aufgeklappter Position oder ein Würfel in oberer bzw. unterer Position. Die Tribünen bieten 25.000 Leuten Platz. Die Sitzplätze sind durch die aufklappende Konstruktion gegen Regen geschützt. Während der Ferien sind verschiedene Feuerwerke, Fontäne und Lasershows geplannt. Ein besonderes Anliegen war vor allem die Schaffung eines Erlebniskomplexes, der zu jeder Jahreszeit zu einem Besuch einlädt.

Projekt, 1998

Status: Diplomarbeit 1998

Nowosibirsk / Russland

Groesse: BGF 24.900 m2

FLUGHAFEN "TOLMATSCHOWO" ERWEITERUNG, NOWOSIBIRSK

Projekt des Internationalen Flughafens Tolmatschowo in Nowosibirsk. Der Flughafen als Luft-Tor zur Verbindung mit anderen Städten der Welt Entworfen wurde das Schema der Erweiterung des Flughafens. Die funktionale Planungstruktur des Komplexes basiert auf drei Hauptachsen: das Administrativgebäude, die Passage und das Zollamtgebäude.

Projekt, 1998

Bauherr: Stadt Nowosibirsk

Das Team: Alexander Jughakov (Yukon), Dmitry Boykov, Alexey Yakovlev

Nowosibirsk / Russland

Groesse: BGF 64.000 m2

FABRIKPFOERTNERHAUS JUMA, KARAGANDA

Das Projekt Pförtnerhaus Mineralwasserfabrik Juma in Karaganda stellt eine geschlossene und unzugängliche Architektur dar. Bei dem 45000 qm großen Komplex handelt es sich um ein mit einem sicheren Einfahrtsbogen und dem Beobachtungsturm entworfenes Pförtnergebäude, das im 2003 realisiert wurde.

Projekt, 1997

Bauherr: JSC Organizing Commitee MJK JUMA

Karaganda / Kasachstan

Groesse: BGF 100 m2